IPHOBAC Integrated Photonic mm-Wave Functions            For Broadband Connectivity

»IPHOBAC HOME
»Careers
»Contact
»Cooperations
»Introduction
»News & Events
»Press Releases
»Project Partners
»Presentations
»Publications
»Reviewer's Area
»Student Cluster
»Technical Reports
»Workshop 2009


Newsticker

EU Workshop 2009
Workshop Proceeding now avalable for download

Newsticker

ist-logo
empty

»Technical Reports

Deliverables

Some of the below mentioned reports are public.
For download instructions, please contact the coordinator of IPHOBAC.

 

Show all Deliverables for Workpackage

  • D110: "Public IPHOBAC Presentation" 4225 kB
  • D111: "Report on 1st General Assembly meeting" 319 kB
  • D112: "1st periodic activity report according to annex II.7.2 including an updated implementation plan for the next 24 months" 16888 kB
  • D113: "First periodic management report and first periodic partners according to annex II.7.2" 1723 kB
  • D114: "Second periodic activity report according to annex II.7.2 including an updated implementation plan for the next 18months and an updated plan for using and dissemination of knowledge" 9739 kB
  • D115: "Second periodic management report and second periodic report on the distribution between partners according to annex II.7.2" 2440 kB
  • D116: "Third periodic activity report according to annex II.7.2 including an updated plan for using and dissemination of knowledge" 20095 kB
  • D117: "Final activity report according to annex II.7.2 including the final plan for using and dissemination of knowledge to be submitted after the end of the project" 11909 kB
  • D118: "Third periodic management report according to annex II.7.2" 1474 kB
  • D119: "Final management report and final report on the distribution between contractors according to annex II.7.2 to be submitted after the end of the project" 990 kB
  • D211: "Definition of End-Users Requirements" 1162 kB
  • D212: "Technological component definitions" 311 kB
  • D221: "Report on test method definition and system integration" 3338 kB
  • D222: "Report on the impact on the system applications" 1932 kB
  • D223: "Report on enhanced solutions and performances" 1681 kB
  • D311: "Report on quantum-dot optimization of mode-locked DBR lasers" 1047 kB
  • D321: "Report on the building blocks for the fabrication technology" 5061 kB
  • D331: "Report on mode-locked DBR lasers (III-VLAB) ready for integration in WP5" 363 kB
  • D332: "Report on the optimization of mode-locked DBR lasers for mm-wave generation" 340 kB
  • D333: "Report on comb generator module characteristics for dual mode injection locking source" 341 kB
  • D334: "Report on mode-locked laser modules for OEO and system evaluation" 245 kB
  • D341: "Report on dual-mode DFB (IEMN) and dual-mode DBR lasers ready for integration in WP5" 510 kB
  • D342: "Report on the optimization of dual-mode DFB/DBR laser for mm-wave generation" 1833 kB
  • D343: "Report on dual-mode laser module characteristics for OEO and system evaluation" 640 kB
  • D411: "Report on TW-photomixer design and fabrication process as well as on planar antenna design" 5940 kB
  • D412: "Report on the highest operating frequency and highest output power of TW photomixers characterized on chip level. Calibration report of TW-photomixer" 272 kB
  • D413: "Report on simulation results of the planar antennas on a hemispherical lens" 11731 kB
  • D414: "Report on design and fabrication of antenna integrated TW-photomixer compliant with end-users requirements and package specifications provided in T4.6" 1721 kB
  • D415: "Calibration report of antenna integrated TW-photomixer" 949 kB
  • D421: "UTC design compliant with the end-used requirements" 403 kB
  • D422: "Report on on-chip characterization of first UTC design for 110 GHz package" 368 kB
  • D423: "UTC devices with integrated antenna compliant with end-users and package specifications supplied for 10GHz to 300 GHz package" 189 kB
  • D431: "First generation TW-EAM integrated with a DFB laser" 2723 kB
  • D432: "Supply of characterized 70GHz EML chips on submount compatible with the U2T w1 EML package" 2639 kB
  • D433: "Supply of preliminary characterized reflective type 100GHz EAM chips compatible to the U2T w1 PD package" 3741 kB
  • D434: "Second generation packaged TW-EAM integrated with a DFB laser (KPRC) compatible to U2T w1 EML package" 4034 kB
  • D441: "First generation EAT integrated with a SOA" 2527 kB
  • D442: "Supply of 2 reflective-type 60GHz EATs (to FT and UDE) and 1 transmissive EAM (to UPVLC) in V-connectorised modules tested up to 60GHz" 339 kB
  • D443: "Second generation packaged EAT integrated with a SOA and antenna" 3451 kB
  • D451: "Report on the design, fabrication and characterization of coaxial 110GHz package photodetectors" 2890 kB
  • D452: "Calibration report of packaged 110GHz photodetectors" 2321 kB
  • D461: "Report on first packages for antenna-integrated photomixers" 911 kB
  • D462: "Calibration report of packaged 300GHz photomixers" 239 kB
  • D511: "Report on the design of hybrid motherboard and daughterboards" 709 kB
  • D512: "Hybrid integrated mm-wave source ready for assessment" 1120 kB
  • D521: "Report on PLL element evaluation (microwave optical laser on chip level) and PLL architecture to be integrated" 343 kB
  • D522: "Report on design of hybrid OPLL" 239 kB
  • D523: "Report on integrated lab trial with chip level devices (III-V Lab) and on low propagation delay OPLL down-converter and loop filter" 1320 kB
  • D524: "Report on the advanced digital phase detector with extended input phase range" 365 kB
  • D525: "Provision of integrated low phase noise Opto-Electronic Oscillator for system measurements" 448 kB
  • D526: "Demonstrator with hybrid integration of UTCs and dual-mode lasers (same performances as above) (CIP, UCL) and provision of mm-wave optical synthesizer electronics (LUB)" 947 kB
  • D527: "Full hybrid integrated tuneable high spectral purity (< -85 dBc/Hz, 10 kHz offset) locked mm-wave source, 10 GHz to 300 GHz" 959 kB
  • D531: "Report on optimized PVM/PVdM architectures and GbE" 3611 kB
  • D532: "Report on optimized phase-shifter design" 1212 kB
  • D533: "Report on laboratory demonstration of PVM/PVdM architectures (UPVLC) including a report on the techno-economic comparison to commercially available assemblies" 1268 kB
  • D534: "Characterization of phase-shifter in SOI technology" 1482 kB
  • D535: "Report on standalone 10Gbit/s PRBS generator with pattern-synchronization output" 914 kB
  • D611: "System experiment with the packaged TW-EAM integrated with a DFB laser" 2662 kB
  • D612: "System experiments with the packaged EAT integrated with a SOA and antenna" 642 kB
  • D613: "Report on 10 Gbit/s QPSK optically modulated and demodulated wireless transmission employing IPHOBAC photonic components" 1525 kB
  • D614: "Report on excellence of IPHOBAC components" 4241 kB
  • D621: "First version of exploitation plan as part of the periodic plan for use and dissemination of knowledge according to annex II.7.2" 415 kB
  • D622: "Second version of exploitation plan as part of the periodic plan for use and dissemination of knowledge according to annex II.7.2" 1619 kB
  • D623: "Final version of exploitation plan as part of the periodic plan for use and dissemination of knowledge according to annex II.7.2" 3216 kB
  • D631: "First report on inquiry to European mm-wave industry" 1709 kB
  • D632: "First feasibility report on spin-off companies in the field of micro/mm-wave technology" 337 kB
  • D633: "Final report on inquiry to European mm-wave industry" 1041 kB
  • D634: "Final report on feasibility of spin-off companies in the field of micro/mm-wave technology" 621 kB
  • D635: "Final report on inquiry to European mm-wave industry" 1002 kB
  • D711: "Architecture and Functions of the IPHOBAC Website" 1057 kB
  • D712: "Report on scientific publications of IPHOBAC" 8932 kB
  • D713: "Report on the advanced website" 777 kB
  • D714: "Summary report of the scientific publications of IPHOBAC" 27193 kB
  • D721: "Report on training activities for the first 18 months" 473 kB
  • D722: "Workshop organized by IPHOBAC" 9646 kB
  • D723: "Report on training activities for the complete project" 444 kB
  • D731: "First report on similar R&D programs" 572 kB
  • D732: "First report concerning actions toward infrastructure providers" 794 kB
  • D733: "Final report on similar R&D programs" 3897 kB
  • D734: "Final report concerning actions toward infrastructure providers" 6907 kB
  • D741: "First report concerning the standardization activities" 1514 kB
  • D742: "Final report concerning the standardization activities (FT) including standardization actions in IEEE 802.16" 1300 kB

 


© IPHOBAC Consortium - Legal notice - Contact: webmaster
Last updated: 20.02.2009